Milestones

Students who successfully implement all of the milestones –on time– should have a nicely working system at the end of the semester. Note that some milestones must be performed by teams (typically two students). Some milestones are group-based (typically two teams). See the table below.

Milestone Team/Group
Milestone 1: Verify Analog Electronics from ECEn 340 and Implement Queues on ECEn 330 Board Team
Milestone 2: Complete MATLAB Modeling of the Laser-Tag System Team
Milestone 3: Implement All ZYBO Software and Demonstrate a Feedback Configuration With the ECEn 330 Board (only) Team
Milestone 4: Integrate Analog Electronics with ECEn 330 board and Demonstrate Working System at 40 Feet Group
Milestone 5: Demonstrate the Fully-Packaged Laser-Tag System Working at 60 Feet (at least) Group
Milestone 6: Creative Project: Augment or Modify the Laser Tag System Group