Line 17: Line 17:
   - Pass/fail   - Pass/fail
  
-====== ​Milestone 1 ====== +====== ​Milestones ​======
-  * Demonstrate operation of analog and digital portions separate+
  
-======= ​Milestone ​1A ======= +[[Milestone 1]]
-{{:​m1a.pdf|}} +
-  * Objective: Demonstrate the operation of A/D and D/A +
-  * Configuration/​inputs +
-  - Function generator (FG) connected to A/D PMOD +
-  - FG signal: 𝑉_1=1.5+0.05sin(2p 38 103 t) +
-  - Oscilloscope (OSC) connected to D/A PMOD+
  
-  * Pass requirements +[[Milestone ​2]]
-  - 𝑉_2= 1.5+0.05sin(2p 38 103 t) +
- +
-======= ​Milestone ​1B ======= +
-{{:​m1b.pdf|}} +
-  * Objective: Demonstrate the operation of analog boards +
-  * Configuration/​inputs +
-  - Function generator (FG) connected to transmitter board +
-  - FG signal: 𝑉_1=0.5+0.5sin(2p 38 103 t) +
-  - LED and photodiode separated by 20’ +
-  - Oscilloscope (OSC) connected to receiver board +
- +
-  * Pass requirements +
-  - AC amplitude of V2>20 mV +
-  - Frequency of V2 = 38 kHz +
-  - Accomplished using FFT math function of the oscilloscope+
  
 +[[Milestone 3]]
  
 +[[Milestone 4]]
  
    