 ===== Milestones ===== ===== Milestones =====
  
-Students who successfully implement all of the milestones --on time-- should have a nicely working system at the end of the semester. Note that some milestones must be performed by individuals,​ as in every student must implement the milestone on their own. Some milestones are group-based. See the table below.+Students who successfully implement all of the milestones --on time-- should have a nicely working system at the end of the semester. Note that some milestones must be performed by teams (typically two students). Some milestones are group-based ​(typically two teams). See the table below.
  
-|                             ​**Milestone** ​                                    | **Individual/Group** | +|                             ​**Milestone** ​                                    | **Team/Group** | 
-| [[Milestone 1]]: //Verify Analog Electronics from ECEn 340 and Implement ​Queues on ECEn 330 Board// |  ​Individual  ​+| [[Milestone 1]]: //Verify Analog Electronics from ECEn 340 and Implement ​a Queue Library Module// | Team 
-| [[Milestone 2]]: //Complete MATLAB Modeling of the Laser-Tag System// ​            ​| ​ ​Individual  ​+| [[Milestone 2]]: //Complete MATLAB Modeling of the Laser-Tag System// ​            ​| ​Team 
-| [[Milestone 3]]: //Implement All ZYBO Software and Demonstrate a Feedback Configuration ​With the ECEn 330 Board (only)// |  ​Individual  ​+| [[Milestone 3]]: //Implement All Software and Demonstrate a Feedback Configuration (on ZYBO board only)// | Team 
-| [[Milestone 4]]: //Integrate Analog Electronics with ECEn 330 board and Demonstrate Working System at 1 Foot// |  Group  +| [[Milestone 4]]: //Integrate Analog Electronics with ZYBO board and Demonstrate Working System at 40 Feet// | Group | 
-| [[Milestone 5]]: //​Demonstrate the Fully-Packaged Laser-Tag System ​Working at 60 Feet (at least)// |  Group  +| [[Milestone 5]]: //​Demonstrate the Fully-Packaged Laser-Tag System ​with Sound// | Group | 
-| [[Milestone 6]]: //Creative Project: Augment or Modify the Laser Tag System// | Group |+| [[Milestone 6]]: //Creative Project: Augment or Modify the Laser-Tag System// | Group |
  