milestone_3 [2015/01/29 08:54] hutch |
milestone_3 [2023/02/06 10:26] (current) scott [Software Coding Standard] |
||
---|---|---|---|
Line 1: | Line 1: | ||
- | ===== Milestone 3 ===== | + | ====== Milestone 3 ====== |
In this milestone you will implement most of the 'C' code that implements the laser-tag system. | In this milestone you will implement most of the 'C' code that implements the laser-tag system. | ||
- | ==== Goal ==== | + | ===== Goal ===== |
- | Demonstrate the system working with a feedback cable (provided) connecting the output of the transmitter to the input of the ADC. You will demonstrate the ability of your system to: | + | Demonstrate the system working with a feedback connection (built into the ECEn Development Board) connecting the output of the transmitter to the input of the ADC. You will demonstrate the ability of your system to: |
* detect hits on each of the 10 frequencies, | * detect hits on each of the 10 frequencies, | ||
* no false detects, | * no false detects, | ||
Line 11: | Line 11: | ||
* display the computed power of each of the channels on the TFT with the provided histogram package. | * display the computed power of each of the channels on the TFT with the provided histogram package. | ||
- | Note: you don't need the feedback cable until the final task. | ||
- | ==== Organization ==== | ||
- | This milestone will be divided into three tasks that will be due and passed off weekly. | + | ===== Organization ===== |
- | - [[Milestone 3 Task 1 | Task 1]]. Implementation and verification of the FIR and IIR filters (filter.c). Demonstrate all sets of of IIR coefficients. | + | |
- | - [[Milestone 3 Task 2 | Task 2]]. Implementation of the transmitter state-machine (transmitter.c), the trigger state-machine (trigger.c), the hitLedTimer state-machine (hitLedTimer.c) and the lockoutTimer state-machine (lockoutTimer.c). | + | |
- | - [[Milestone 3 Task 3 | Task 3]]. Implementation of the detector (detector.c) and integration with all other parts of the project in order to perform the final pass-off for the overall milestone. | + | |
+ | This milestone will be divided into three tasks that will be due and passed off as recorded in Learning Suite. | ||
+ | - [[Milestone 3 Task 1 | Task 1]]. Implementation and verification of the FIR and IIR filters (filter.c). Demonstrate all sets of IIR coefficients. | ||
+ | - [[Milestone 3 Task 2 | Task 2]]. Implementation of the transmitter state-machine (transmitter.c), the trigger state-machine (trigger.c), the hitLedTimer state-machine (hitLedTimer.c), the lockoutTimer state-machine (lockoutTimer.c), and the code to compute the power in the output from each IIR band-pass filter. | ||
+ | - [[Milestone 3 Task 3 | Task 3]]. Implementation of the detector (detector.c) and integration with all other parts of the project in order to perform the final pass-off for the overall milestone using the feedback provided by the development board. | ||
+ | |||
+ | ===== Software Coding Standard ===== | ||
+ | |||
+ | All of the tasks comprising Milestone 3 are software tasks and must adhere to the [[https://byu-cpe.github.io/ecen330/other/coding-standard/|coding standard]]. **Exception: clang-format is not required. Ignore any clang-format rules.** | ||
+ | |||
+ | See learning suite for a breakdown of the credit that you receive for pass-off and source-code submission. | ||